Scoping/

TTC Specialist & Adventure

1

Customer Context

Business Context

TTC is a global travel group. The S&A division is the FIT arm, currently operating on Calypso (shared reservation system historically owned by AW). ATI and LWT are already live on Kaptio in an existing org. This program migrates AW and BV onto Kaptio and consolidates all 4 brands. Architecture: deploy Gold Config into a full copy sandbox of the existing ATI/LWT prod org — existing integrations (Oracle, payments, Amadeus) remain in place and are validated alongside new configuration. TTC has a heavily invested enterprise web platform (Pier 1 — headless CMS, Next.js, Tailwind, React, Boomi abstraction layer) — Kaptio is positioned as the reservation system, not the web platform. PE-influenced decision-making: brand MDs approve business cases tied to ROI. Discovery approach: outcome-based, Kaptio Gold Config capability model led with gap analysis. Long history of discussions (since 2018) with multiple stop-start cycles — current momentum driven by Mark (new Tech Director) and Peta-Lee (PM) with proper governance. A Discovery-only SoW was previously drafted: 146 man-days, EUR 187,070, 10-week programme.

Current Systems: Calypso (reservation system — primary system being replaced; shared across AW and BV), Tropics (online portal — SGT bookings, B2C/TAP/WL, courtesy holds, invoicing), Kaptio (existing org — ATI and LWT already live, Oracle and payment integrations working), AXUS (content/itinerary builder — BV Dublin Custom Groups team), SupplierWeb (supplier portal for confirmations — primary supplier comms route), HotelLink / CarLink (API-based supplier booking within Calypso), Salesforce CRM (full SF licences in CRM org — CRM strategy TBC: enquiry in Kaptio vs Lead in SF), Amadeus (air integration — AW: 2 Office IDs (NZ + AU), BV: 3 Office IDs (2 CA + 1 US)), Eos (content management for itinerary descriptions and images — to be migrated to Kaptio as content master), MTP / TAP (online customer and agent portals), Semaphore / PCI Pal (PCI-compliant phone payment processing), Marketing Cloud (CRM marketing — OUT OF SCOPE per TTC, like-for-like NL to CRM continues), Oracle (finance/ERP — existing integration with ATI/LWT via Kaptio, confirmed carry-forward), PGI (payment gateway — BV group payment templates; TTC internal discussion: Kaptio-built or LCW-maintained), TOPS (tour director system — BV Small Group Tours), Content1 / C1 (TTC content management — touring brands), TTC Enterprise Web Platform / Pier 1 (headless CMS, Next.js, React, Boomi), Genesys (call centre telephony — in-scope TBC, pending TTC internal tech discussion), Power BI / Microsoft Fabric (enterprise analytics direction), Wetu (ATI/LWT content — TBC how this fits with Kaptio as content master)
Revenue: Multi-brand ARR opportunity. Full Yr PAX 2025: AW 6,878 (10% D2C, 90% Trade), BV [TBD] (15% D2C, 85% Trade), ATI 1,682 (5% D2C, 95% Trade), LWT 1,807 (95% D2C, 5% Trade). Team headcounts: ATI/LWT 50, AW 60, BV 60 (AW/BV excludes Sales/Marketing). Discovery SoW: EUR 187k. Implementation CAPEX: TBD. Edge Documents potential additional commercials.
Deal Status: Discovery SoW previously drafted (146 days, EUR 187k). TTC questionnaire responses received with volume data, team headcounts, and integration details. AW brand column still empty. TTC has NOT seen Edge Docs yet — Gold Org demo requested with Docs included. Go-live sequencing TBC pending demo. Tracy needs firmed-up discovery start dates for Mark this week.

Timeline

Target: Discovery SoW sign-off: April 2026. Discovery start: TBC (previously 8-12 weeks proposed, TTC said "TBC"). Go-live sequencing: TBC pending Gold Org demo.
Rationale: TTC executive mandate to consolidate S&A FIT brands on Kaptio. Mark (Tech Director) pushing for earliest possible discovery start. Previous SoW drafted at 10-week Discovery programme. TTC wants Sept 2026 go-live but Tracy communicated "discovery won't start until June" and "we won't achieve a Sept go-live."
Realistic: Discovery: 10 weeks (per previous SoW structure). Go-live sequencing TBC. BV-first was proposed but TTC said "TBC — needs to be decided once Demo has been done." Realistic go-live: Q4 2026 at earliest for first brand, Q1-Q2 2027 for second brand.
TTC wants Sept go-live but the slot was missed. Mark asked: (1) What can we do to make this happen? (2) How much can we shave off discovery? (3) What should be deferred to Phase 2? Risk: TTC may go to RFP if timeline pushes to 2027. One Africa is a churn risk.

Team

sales: Unknown
operations: 170
technical: Unknown
management: Unknown

Competitive Context

Competitors: Calypso (incumbent — system being replaced), Potential RFP if timeline slips to 2027

Kaptio offers Salesforce-native platform with unified CRM, Edge Docs for branded proposals, out-of-the-box FIT capability model via Gold Config, and path to cross-brand product bundling. ATI/LWT already live on Kaptio validates platform fit. Calypso limitations: no unified CRM, manual documents, limited reporting, brand-siloed operations.

Assumptions

  • Single Salesforce org for all 4 S&A brands — CONFIRMED in questionnaire
  • Full copy sandbox of ATI/LWT production org — CONFIRMED. Gold Config deployed into sandbox. Not a new clean org.
  • Existing ATI/LWT integrations (Oracle, payments, Amadeus) remain in sandbox — CONFIRMED. Validated alongside new config.
  • ATI/LWT legacy customisations may need replacing (dupe record types etc) — CONFIRMED caveat
  • Go-live sequencing: TBC pending Gold Org demo — BV-first proposed but NOT confirmed by TTC
  • TTC payment gateway carries forward — CONFIRMED. Include AUS B2B EFTs.
  • AW nett commission — CONFIRMED. BV gross + nett channels — CONFIRMED (BV needs both)
  • Car hire integration for 4 providers (Alamo, Avis, Hertz, Enterprise) — CONFIRMED showstopper, Kaptio roadmap
  • 6 named live supplier connections to replicate: DTOW, Allied T Pro, Bonotel, Jonview, ATI, HotelBeds
  • Edge Docs: TTC has NOT seen it — acceptance pending Gold Org demo with Docs. "Need to Present this option vs Custom Docs."
  • BV Custom Groups: "Not MVP but easy win — TBC in Discovery." Later marked "Groups out of scope" for MVP.
  • BV Small Group Tours (SGT) — CONFIRMED out of scope
  • Online Booking Engine NOT Phase 1 — CONFIRMED
  • Boomi middleware NOT Phase 1 — CONFIRMED
  • Marketing Cloud — CONFIRMED out of scope
  • DMC work for TTC touring brands — CONFIRMED out of scope
  • ATI/LWT data migration — CONFIRMED separate workstream
  • Kaptio to be content master for all 4 brands (Eos content migrated in) — CONFIRMED
  • Wetu (ATI/LWT content) — TBC how this fits with Kaptio as content master
  • Discovery approach: 9-week cycle (2x 3-week sprints + cooldown) — CONFIRMED
  • Discovery timeline: TBC (8-12 weeks proposed, not yet confirmed)
  • Gold Org demo pre-Discovery — CONFIRMED, must include Edge Docs
  • Brand teams map as-is processes to Kaptio capability model — CONFIRMED
  • Gap analysis with T-shirt sizing (XS/S/M/L/XL) mapped to indicative commercial ranges — CONFIRMED
  • Brand-specific customisations require ROI business case from brand MD — CONFIRMED
  • Governance: Steerco (internal, Kaptio ad hoc), Project Team weekly (incl Kaptio), Process Team ad-hoc
  • Kaptio Evolve post go-live — CONFIRMED. Hypercare TBC. Full support model details requested (timezones, out of hours)
  • Data migration phased (active first, "active" to be defined) — CONFIRMED
  • ECO codes mapped to Kaptio framework, not 1:1 replication — CONFIRMED
  • Legacy June 2024 requirements as background only — CONFIRMED
  • Data archiving best practice as part of MVP — TTC requirement (new)
  • Data masking in full copy sandbox for compliance — TTC requirement (new)
  • ATI/LWT operations must not be impacted by implementation — TTC requirement (new)
  • PGI ownership TBC: Kaptio-developed or TTC internal (LCW) — TTC internal discussion
  • AW questionnaire data still missing — AW brand column empty in spreadsheet
  • Previous Discovery SoW: 146 man-days, EUR 187,070, 10 weeks, rate card EUR 1,135-1,669/day
2

How We Work

Kaptio's implementation approach and the roles & responsibilities split.

🎯

Approach

Outcome-based phased delivery

🔍

Discovery Process

Structured discovery workshops led by Kaptio implementation consultants. Follows TTC's confirmed 9-week cycle: 2x 3-week sprints + 2-3 week cooldown, demos after each sprint, stakeholder sign-off at cycle end. Dual-track: Discovery and Delivery run concurrently. Gold Config capability model leads — demonstrate OOTB, identify gaps against as-is processes. Previous SoW: 8 themed workshops over 10 weeks. Discovery outputs: gap analysis, updated capability model, solution design, implementation roadmap, business case validation with ROI, risk register.

🚀

Delivery Model

Kaptio-led implementation with iterative build-validate cycles. Configuration, data loading, and integration work done by Kaptio. UAT structured with test scripts per brand. Training hands-on in live environment. Hypercare post go-live per brand (duration TBC — TTC wants full support model details). Kaptio Evolve post go-live for continuous improvement.

📋

Governance

Steerco (internal to TTC) — Kaptio joins ad hoc if required, weekly/bi-weekly. Project Team weekly (including Kaptio). Process Team ad-hoc. Brand MDs approve brand-specific business cases. Alistair (S&A MD) approves overall program. Formal milestone sign-offs at phase boundaries.

Roles & Responsibilities

Who does what — Responsible, Accountable, Consulted, Informed

ActivityKaptioCustomerNotes
Discovery workshopsRCKaptio leads. TTC provides SMEs per brand for validation. Per previous SoW: Lead BA + Solutions Architect drive workshops.
Org architecture validation (sandbox)RCKaptio deploys Gold Config into ATI/LWT sandbox. TTC provides full copy sandbox access.
ATI/LWT legacy cleanupCRATI/LWT team cleans dupe services/record types. Kaptio advises on Gold Config compatibility.
Platform configurationRIKaptio configures 4-BU org, currencies, security.
Service catalog setup (per brand)RCKaptio builds catalog. Brand teams validate supplier data, rates, pricing rules.
Supplier integration mappingRCKaptio maps 6 named live integrations to showcase. TTC confirms which are actively used.
Car hire integration developmentRIKaptio product team delivers for 4 providers. TTC provides provider details and testing support.
Commission model configurationRCKaptio configures triple model (AW nett, BV gross, BV nett). TTC validates with sample bookings.
Edge Docs template designRASubject to Edge Docs acceptance post Gold Org demo. Kaptio designs, brand teams approve.
Payment gateway integrationRCTTC gateway carry-forward + AUS B2B EFTs. TTC provides merchant credentials.
UAT test execution (per brand)CRBrand teams execute test scripts. Kaptio provides scripts, guidance, issue triage.
User training (per brand)RAKaptio delivers hands-on training. TTC ensures team attendance.
Go-live cutover (per brand)RAKaptio manages cutover checklist. TTC approves go/no-go per brand.
Hypercare support (per brand)RCDuration and support model TBC (TTC wants full details: timezones, out of hours, scope).
Data migration planningCRTTC owns Calypso data extraction. Kaptio provides import tooling and guidance. "Active" data to be defined.
Content migration (Eos → Kaptio)RCKaptio becomes content master. TTC validates content quality and completeness.
Business case validationCRPer previous SoW deliverable: validated business case with benefits, costs, ROI for TTC internal approval.
Change managementCRTTC drives internal change across 4 brands. Kaptio provides materials.

Managing Changes to the Baseline

Every outcome has a baseline plan shaped by Kaptio Gold Config and confirmed in workshops. When sessions reveal differences, they are captured as deltas — documented, classified, tracked to resolution. Delivered with T-shirt sizing (XS/S/M/L/XL) mapped to indicative commercial ranges.

Workshop
Delta Identified
Classified
Documented
Resolved
⚙️

Configuration Delta

Variations addressed through standard Kaptio configuration — picklist values, workflow rules, field mappings, pricing rules, document layouts, commission model parameters.

Handling: Captured as a user story with acceptance criteria. Prioritized within current phase. Delivered by Kaptio implementation team.
Commercial: Absorbed within implementation — no additional cost. Most common delta type.
🔧

Customization Delta

Requirements beyond standard configuration — custom Apex, LWC components, integration modifications, Edge framework extensions.

Handling: Scoped as mini-project: effort estimate, timeline impact, technical design review. Approved by steering committee before build. Built via The Edge framework to protect core.
Commercial: Scoped and estimated separately. May impact timeline or cost. Transparent estimation shared with TTC before work begins.
🔬

Product Development Delta

Requirements needing Kaptio core product changes — new features, API capabilities, platform enhancements. Car hire integration falls here.

Handling: Escalated to Kaptio product team. Assessed against roadmap. May be roadmap acceleration or separate engagement.
Commercial: Separate engagement or co-investment. Car hire committed to roadmap as contractual clause.

Documentation

Each delta documented as a user story with: (1) baseline assumption, (2) actual requirement, (3) acceptance criteria, (4) classification, (5) effort and timeline impact. Tracked in shared backlog visible to both Kaptio and TTC.

Governance

Configuration deltas: Kaptio project lead (immediate). Customization deltas: steering committee. Product development deltas: Kaptio product team with steering recommendation.

2

What We Know

Discovery progress and unanswered questions that affect estimation confidence.

Discovery Progress

6% Complete
2
Confirmed
0
Assumed
31
Unknown
33
Total

31 Unanswered Questions — Blocking Estimation Confidence

What percentage of your bookings are pre-built packages vs. bespoke/tailormade itineraries?Determines which Quest workflow to prioritize and whether both are needed
How many active packages/products do you currently sell? How many need to be live at go-live vs. added later?Drives catalog complexity and data loading effort
What types of services are in your packages? (Hotels, flights, rail, transfers, activities, guides, cruises, etc.)Determines service catalog scope and supplier mapping complexity
Do you sell through travel agents or B2B trade partners? If so, how many active agents?Determines if B2B agent sales outcome is needed
What documents do you currently send to customers? (Quotes, confirmations, travel docs, invoices, vouchers, manifests)Determines document generation scope and Edge Docs configuration
+26 more
3

Delivery Plan

22 outcomes across 3 phases — what we deliver and how we get there.

aWhat We'll Deliver

Core Foundation

(4 included)

Product Experience

(5 included, 1 deferred)

Channel

(6 included, 2 deferred)

Advanced

(7 included, 1 deferred)

bHow We'll Get There

Implementation Phases

3 phases

Discovery

Gold Config-led strategic discovery across AW and BV. Capability mapping, gap analysis, solution options for steering committee. Org architecture validation in sandbox. Go-live sequencing decision. Edge Docs demo and acceptance.

10 weeks (per previous SoW structure)

Previous SoW: 146 man-days, EUR 187,070, 10-week programme, 8 workshops. 9-week cycle confirmed by TTC: 2x 3-week sprints + 2-3 week cooldown. Dual-track: Discovery + Delivery concurrent. Gold Org demo with Docs before kick-off. Key decisions during Discovery: go-live sequencing, CRM strategy, Custom Groups scope, Edge Docs acceptance.

Foundation & First Brand Go-Live

Platform foundation (sandbox + Gold Config), first brand FIT configuration, core integrations, document design. Which brand goes first TBC pending demo.

TBD (pending discovery)
B2B & B2C CRM SetupCustom Security ModelPackages & Selling PricePayments That Just WorkQuotes That ConvertSales Proposals That ConvertSell Pre-Built FIT PackagesSupplier ConnectivitySuppliers, Services & Contracted RatesSystem Integrations Made SimpleTailormade Trips That WowTrade Partners That Sell MoreYour Kaptio Foundation

Go-live sequencing TBC. BV-first proposed but not confirmed by TTC.

Second Brand Go-Live & Operations

Second brand go-live. Full reservation lifecycle, operations, documents, financial integration, potential Custom Groups.

TBD
Air Ticketing, IntegratedAutomated Guest CommunicationsBusiness Intelligence at Your FingertipsConfirmations, Financial Summaries & Final DocsExport to ERPFIT Bookings, EffortlesslyFinancial Clarity, FastGroup Business, StreamlinedGuest Details, Captured Seamlessly

Custom Group inclusion subject to Discovery outcome. ATI/LWT operations must not be impacted.

4

Risks & Next Steps

Known risks and open questions that need answers before finalizing.

Risks (15)

Edge Docs not yet seen by TTC — document scope cannot be confirmed until after Gold Org demo

Mitigation: Gold Org demo must include Edge Docs (TTC requested). Schedule demo before Discovery kick-off. If TTC rejects Edge Docs, alternative "Custom Docs" scope is completely undefined.

HIGH

Go-live sequencing not confirmed — BV-first is our assumption but TTC says "TBC pending demo"

Mitigation: Gold Org demo is the prerequisite. Ensure demo covers both brand scenarios. Prepare both BV-first and AW-first timelines.

HIGH

Sept 2026 go-live timeline is very aggressive — TTC missed their slot by delaying signing

Mitigation: Phased approach with first brand go-live Q4 2026 at earliest. Discovery start dates must be firmed up this week.

HIGH

TTC could go to RFP if timeline pushes to 2027 — One Africa is a churn risk

Mitigation: Show momentum: fast discovery start, visible progress. Leverage ATI/LWT existing platform as proof of fit.

HIGH

AW questionnaire data still missing — half the scope based on Dec 2 onsite assumptions only

Mitigation: AW brand team must complete questionnaire before or during early Discovery. Cannot size AW scope without this.

HIGH

Car hire integration for 4 providers (Alamo, Avis, Hertz, Enterprise) — not in Kaptio today, showstopper

Mitigation: Kaptio committed to roadmap as contractual clause. 4 providers is more than "Hertz mentioned" — need build timeline per provider.

HIGH

ATI/LWT legacy customisations in sandbox may conflict with Gold Config deployment

Mitigation: ATI/LWT already cleaning dupe services. Assessment during early Discovery. ATI/LWT operations must not be impacted.

HIGH

Dual + triple commission model complexity — AW nett, BV gross, BV also needs nett channel

Mitigation: Dedicated pricing workshop per brand. Three channel configurations needed, not two.

HIGH

5 Amadeus Office IDs across brands — more complex than "different Office ID per brand"

Mitigation: Validate ATI/LWT Amadeus usage extent. Map all 5 IDs during integration workshop.

MEDIUM

Brendan online contracting is actually two requirements (contract management + supplier portal)

Mitigation: Two-track assessment during Discovery. Both are gaps — Kaptio has no OOTB solution for either.

MEDIUM

Kaptio as content master for 4 brands — EOS migration + Wetu (ATI/LWT) consideration

Mitigation: Content strategy workshop during Discovery. Assess Wetu fit. Migration scope TBD.

MEDIUM

CRM strategy not decided — "enquiry in Kaptio vs Lead in SF" still TBC

Mitigation: Decision required early in Discovery. Affects CRM configuration scope significantly.

MEDIUM

PGI ownership undecided — Kaptio-built or TTC internal (LCW)

Mitigation: TTC internal discussion (Nikki/Patrick). Decision needed before payment integration scoping.

MEDIUM

Governance model different from what Kaptio assumed — Kaptio joins Steerco ad hoc only

Mitigation: Ensure Project Team weekly is sufficient for decision velocity. Escalation path via Mark clear.

MEDIUM

Stop-start history (since 2018) — stakeholders eager but cautious

Mitigation: Strong governance with Mark (Tech Director) and Peta-Lee (PM). Business case anchored decisions.

HIGH

Open Questions (15)

Sorted by priority — high priority questions have the biggest impact on estimation confidence.

Firmed-up Discovery start date — Tracy needs to give Mark dates THIS WEEK

high

Mark asked to pull forward from June. Need to confirm Kaptio team availability. Previous SoW structured as 10-week programme.

Gold Org demo scheduling — TTC prerequisite for go-live sequencing and Edge Docs decisions

high

TTC: "TBC — Needs to be decided once Demo has been done." Demo must include Edge Docs. Multiple downstream decisions blocked until demo happens.

AW questionnaire data — AW brand column is EMPTY in the spreadsheet

high

Cannot size AW scope without AW brand input. BV and SB columns completed but AW has provided nothing.

BV PAX volume — number not provided in questionnaire (AW 6,878, ATI 1,682, LWT 1,807 provided)

high

Needed for capacity planning, integration prioritisation, licensing estimation.

Revenue data per brand — Mark asked to share additional info already shared

high

Questionnaire: "Asked Mark to share additional info already shared regarding revenue." Not yet received.

Edge Documents commercial scope — TTC wants it, Mark needs budget sign-off, TTC has not seen Edge Docs yet

high

Gold Org demo is prerequisite. If accepted: additional commercials for Mark's budget. If rejected: Custom Docs scope undefined.

ATI/LWT MVP definition — "What is the MVP for ATI/LWT? Implementation must ensure operations are not impacted"

high

TTC raised this. Sandbox approach addresses partially, but explicit ATI/LWT MVP scope needs definition.

Car hire integration: build timeline for 4 providers (Alamo, Avis, Hertz, Enterprise)

high

Showstopper. 4 providers confirmed (previously only Hertz mentioned). Need Kaptio product team timeline per provider.

ATI/LWT Amadeus integration — validate to what extent it is used

medium

Questionnaire: "Confirm to what extent LWT/ATI Amadeus Integration is used." Affects sandbox validation scope.

Genesys call centre integration — TBC pending TTC internal tech discussion

medium

Questionnaire: "TBC — Discuss internally within Tech."

PGI development ownership — Kaptio or TTC internal (LCW)?

medium

Questionnaire: "Will PGI be developed by Kaptio? Nikki/Patrick discussing if UW PGI will be maintained by LCW."

CRM strategy — enquiry in Kaptio vs Lead in SF

medium

Questionnaire: "TBC Pending CRM Strategy." Full SF licences exist in CRM org.

Content management: Wetu (ATI/LWT) fit with Kaptio as content master

medium

Questionnaire: "TBC — Consider ATI/LWT have Wetu." Kaptio confirmed as content master for all 4 brands.

Data archival: TTC policies for historical Calypso data ("active" to be defined)

medium

Questionnaire: "active to be defined." TTC also wants data archiving best practice as part of MVP.

Kaptio Evolve support model details — timezones, out of hours, hypercare period

medium

Questionnaire: "Hypercare period TBC and more details on support model to be supplied. This is full support for all functionality."

5

Statement of Work

Draft SOW status and link to the generated document.

SOW Draft Available

Draft
Scenario
discovery-phase
Generated
10 Apr 2026
Effort
146 man-days
Cost Range
€187,070

To regenerate: "generate SOW for ttc-saab"